On the coming into force of the present Treaty, all military and naval aeronautical material, except the machines mentioned in the second and third paragraphs of Article 198, must be delivered to the Governments of the Principal Allied and Associated Powers.
Delivery must be effected at such places as the said Governments may select, and must be completed within three months.
In particular, this material will include all items under the following heads which are or have been in use or were designed for warlike purposes:
Complete aeroplanes and seaplanes, as well as those being manufactured, repaired or assembled.
Dirigibles able to take the air, being manufactured, repaired or assembled.
Plant for the manufacture of hydrogen.
Dirigible sheds and shelters of every kind for aircraft.
Pending their delivery, dirigibles will, at the expense of Germany, be maintained inflated with hydrogen; the plant for the manufacture of hydrogen, as well as the sheds for dirigibles, may, at the discretion of the said Powers, be left to Germany until the time when the dirigibles are handed over.
Engines for aircraft.
Nacelles and fuselages.
Armament (guns, machine guns, light machine guns, bomb-dropping apparatus, torpedo-dropping apparatus, synchronization apparatus, aiming apparatus).
Munitions (cartridges, shells, bombs loaded or unloaded, stocks of explosives or of material for their manufacture).
Instruments for use on aircraft.
Wireless apparatus and photographic or cinematograph apparatus for use on aircraft.
Component parts of any of the items under the preceding heads.
The material referred to above shall not be removed without special permission from the said Governments.